The purpose of this project is to replace the existing soffit with new soffit panels. This project will be limited to replacing the existing soffit with new panels of a similar design, replacing any rotted or damamged wood, and paint. An alternate bid is also requested to wrap the fasciae on the “ends” of the building with aluminum.
 
This project will be subject to current Madison County Prevailing Wage Rates.
 
Please click the “Plans & Specifications” tab above for access to the download link for the bidding documents for this project. Please be advised that Addendum 01 has been released.


 
NON-MANDATORY PRE-BID CONFERENCE
Wedneday, November 1, 2017 at 9:00 AM held at the America’s Central Port Office.
 
BIDS DUE
Wednesday, November 8, 2017 at 9:00 AM at the America’s Central Port Office
 

ADDENDUMS

Addendem 01
DOWNLOAD 

 

BIDDING DOCUMENTS

Plans & Specifications:     DOWNLOAD

Entries for C0117D - PHL

Displaying 1 - 5 of 5
Company Name Phone
eplan (877)375-2666
sss (123)987-6789
Tindall Construction (618)797-6744
ZDFAS (456)987-1236
ePlan (573)447-7130
Company Name Phone
Powered by Gravity Forms Directory
Displaying 1 - 5 of 5
Below you will find the listing of the Companies which attended the Pre-Bid Meeting:

Contractor Name
Contractor Name
Address
Address
Phone #


Entries for C0117D - FAQ

Displaying 1 - 3 of 3
Question Answers
Could you send me the Bid opening nos and if a contract was awarded.
Thanks
John Gasser
 
Did you get my question last week? Yes, please see the answer below.
Had a thought that it might be cheaper (haven't ran numbers) to take out existing soffit and put an f channel on the wall and j channel on the fascia and run a solid soffit. Also this would eliminate all painting except the gable ends. Thoughts? Thank you for the suggestion. Yes, this method had been considered as part of the C0117A project and was determined not to be cost effective. This was mainly due to the utilities attached to the rear of the building. The electrical conduit is tucked against the existing soffit, and all of it would have to be adjusted to attach the f channel.